Yesterday we had the chippies back in to prop up the garage, photos to follow soon I hope. This was required because we need to place six or so courses of bricks under the garage wall frame, to lift it off the ground and stop it from getting wet and rot.
I will also post some pics of the brickie progress.....
Edit... As promised here are some pics from the 22/08....
The front 2/3rds done...
The side 1/3rd done.....
The garage being prope up, as you can see the timber frame has been cut to allow the brcik courses to be built under the frame work...side wall......
This is the rear wall of the garage with the frame work cut down, ready for bricking the six or so courses.....